Transect Analysis - Example: Transect of a Protected Area
![]() |
In the project, participatory planning processes were used successfully on a number of different occasions, including:
|
![]() |
As described in Map 1, two cross-sections have been analysed during the transect. The following features have been identified at the cross-sections of the protected area.
Figure 2: North-south cross section west of the protected area |
|
Table 1: Transect A |
![]() |
Figure 3: North-south cross section west of the protected area
Table 3: Transect B |